Skip to content
Electric-traced tubing bundle displayed on a table

Heated analyser sample lines

Review the temperature and wetted construction needed to transport a sample to an analyser.

Discuss your application
APPLICATION GUIDE

Preserve the sample journey, not just the tube temperature.

The duty

The June 2026 line card includes analyser and sample-line heat tracing within the self-regulating electric-traced range. A heated line can be considered where the sampling design calls for temperature maintenance between the extraction point and the analyser. The analyser method determines the required sample condition.

Define what must reach the analyser

Provide sample composition, pressure, flow and the required temperature window. Include water content or condensation concerns where relevant, and identify any constituents that must be preserved for measurement. The wetted tube and surface finish must suit the analytical requirement as well as the transport duty.

Review the whole sampling system

Include the probe connection, line length, exposed ends and entry to the analyser or conditioning equipment. For CEMS or other specialist gas analysis, ask PMA to review the dedicated sample-line construction and documentation. A general electric-traced tubing description does not establish compatibility with every emissions-monitoring method.

PRODUCT SELECTION

Tubing families to review.

Compare the range

The appropriate construction, ratings and documentation depend on your process conditions and the exact supplied assembly.

Can any heated tube be used for CEMS?

No. The sample composition, measurement method and complete sampling arrangement need assessment. Request the appropriate dedicated construction and documentation for the particular duty.

CONTINUE YOUR REVIEW

Related specification guides.

Let’s talk about
your application.

Talk to PMA about heated analyser sample lines. Share the fluid, temperature duty and installation details so we can review the complete tubing assembly.

  • Advice for your application. Review the tube material, heating arrangement, insulation and jacket around your process.
  • Practical service support. Ask about product documentation, termination accessories and installation requirements.
  • Clear next steps. Ask a technical question or request a callback, with your site and measurements in mind.
  • An enquiry, not a mailing list. Your details are used to respond to you. You won’t be added to a marketing database.

Prefer to speak with us?

Call 01484 843 708

You can also email sales@pma.uk.com.

Tell us how we can help

Share your requirements below. All fields are required.

Privacy *

The details you share are used so that our team can respond to your enquiry. Please refer to our privacy policy for how we protect your data. Spam protection is provided by Cloudflare Turnstile; its Privacy Policy and Turnstile Privacy Addendum apply.

Loading spam protection…

Thank you for choosing PMA.

Your details are used to respond to you, and you won’t be added to a marketing database. Read our privacy policy.